We took delivery last week on a Saturn 2 with CNCRP Nema 34 Plug & Play. I'm hoping I can get a couple of questions answered here on the forum.
1. What is the procedure for mechanically squaring the gantry to the frame? The gantry is out of square about 5/16" from side to side. With the Y side just touching the bumper, the slave side is about 5/16" off. On other R&P dual drive machines I've worked on, you loosen the gantry interface plate bolts on both sides and run the homing function so that the two side square themselves, then "snug" one side, jog the gantry around and re-home before tightening the both sides. Should I perform the same procedure with the Saturn?
2. We had to modify the A axis e-chain track in order for the cables to be long enough to reach the P&P boxes. Is there any reason we're not thinking of that the track has to extend all the way to the front of the frame?
Attachment 379666
Thanks in advance,
Mick