I've got a 2006 RH19 Cent7 without a tool changer. I'm looking to plant as many vises as I can fit on the table and machine some parts that will use multiple tools. It would be handy to use g540, g541, g542, etc for the work offsets. This is not the same as clamping an oversize part in the vise and machining multiple parts with a standard repeating offset. The vises may be different heights and not in a line. I want to run the first tool on each vise(offset) then change the tool and run all the vises. I don't want to run all the tools for each vise then change the offset and run all the tools for the next vise. Too much time changing tools. I know I can do this using Fusion 360, but for simple parts, it's not necessary. I'd like to use the conversational Milltronics programming to pull this off.
Any thoughts?
Thanks
James