586,692 active members*
3,117 visitors online*
Register for free
Login
IndustryArena Forum > CAM Software > BobCad-Cam > V23 run time estimate?
Results 1 to 8 of 8
  1. #1
    Join Date
    Jul 2005
    Posts
    409

    V23 run time estimate?

    I just upgraded to v23 pro from V21,

    Is there a way in V23 to do a run-time estimate? i can't seem to find it if there is.

    thanks for any help,
    Cutmore

  2. #2
    Join Date
    Mar 2009
    Posts
    291

    run time

    post your code and run a simulation in predator editor.Make sure your post has a predator header .


    O6270
    (BEGIN PREDATOR NC HEADER)
    (MACH_FILE=3AXVMILL.MCH)
    (MTOOL T1 S1 D4. H5. DIAM_OFFSET 1 = 2.)
    (MTOOL T2 S1 D.5 H5. DIAM_OFFSET 2 = .25)
    (MTOOL T3 S1 D.75 H5. DIAM_OFFSET 3 = .375)
    (MTOOL T4 S1 D.318 H5. DIAM_OFFSET 4 = .159)
    (MTOOL T5 S1 D.375 H5. DIAM_OFFSET 5 = .1875)
    (MTOOL T6 S1 D.406 H5. DIAM_OFFSET 6 = .203)
    (MTOOL T7 S1 D.375 H5. DIAM_OFFSET 7 = .1875)
    (SBOX X-.3 Y-1.75 Z-1. L7.66 W1.75 H1.)
    (END PREDATOR NC HEADER)

  3. #3
    Join Date
    Jul 2005
    Posts
    409

    v23 machining time estimate

    1234567,
    thanks for the reply,
    maybe I missed something or maybe I worded my question poorly,
    I am looking to see if there is a way to estimate the machining time with V23.

    I can post, I can simulate, but I can't see anywhere that gives me the time for the machining.

    Thanks,
    Cutmore

  4. #4
    Join Date
    Mar 2009
    Posts
    291

    cycle time

    look at bottom right side of uoyr screen there should be a cycle time

  5. #5
    Join Date
    Mar 2009
    Posts
    291

    cycle time

    Click image for larger version. 

Name:	screen shot.jpg 
Views:	113 
Size:	63.6 KB 
ID:	80981

  6. #6
    Join Date
    Jul 2005
    Posts
    409
    Thanks for the screen shot,
    It doesn't look like I have the ability to backplot under the predator editor. i looked under the lisence menu and there are no checks there.
    I will have to call bobcad to check that out I guess.

    Thanks,
    Cutmore

  7. #7
    Join Date
    Mar 2009
    Posts
    291

    simulation

    i have level two undersimulation

  8. #8
    Join Date
    Jul 2005
    Posts
    409
    Thanks,
    i am waiting for a call back from Tech suport.
    Best Regards,
    Cutmore

Similar Threads

  1. Beta Run time estimate
    By barbter in forum NCPlot G-Code editor / backplotter
    Replies: 1
    Last Post: 05-30-2008, 12:31 PM
  2. How to estimate the value of my used machine
    By 1ctoolfool in forum Haas Mills
    Replies: 5
    Last Post: 01-22-2008, 05:11 PM
  3. RFQ/estimate question
    By turmite in forum Employment Opportunity
    Replies: 8
    Last Post: 09-01-2006, 11:33 PM
  4. dry run's time estimate ?
    By lepton in forum CNC (Mill / Lathe) Control Software (NC)
    Replies: 1
    Last Post: 07-03-2006, 12:02 AM
  5. operation time estimate in setup sheet ?
    By andy55 in forum Mastercam
    Replies: 3
    Last Post: 10-06-2005, 06:14 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •