586,036 active members*
3,695 visitors online*
Register for free
Login
IndustryArena Forum > Manufacturing Processes > Turning > Acme 1 1/4" -4 double lead stub acme ext threading.
Results 1 to 5 of 5
  1. #1

    Acme 1 1/4" -4 double lead stub acme ext threading.

    Hello. I could use help G76 programming the threads mentioned above on a cnc lathe with fanuc controls. Material is 86L20. Threads are 1.5 long. I have never done anything like this and would definitely appreciate help. Thanks.

  2. #2
    Quote Originally Posted by howardjones View Post
    Hello. I could use help G76 programming the threads mentioned above on a cnc lathe with fanuc controls. Material is 86L20. Threads are 1.5 long. I have never done anything like this and would definitely appreciate help. Thanks.
    They are external threads

  3. #3
    Join Date
    Dec 2013
    Posts
    5717

    Re: Acme 1 1/4" -4 double lead stub acme ext threading.

    Most CAM programs will generate the G code to do exactly what you want. The Z start point is offset for the second lead. You just need to make sure that you are using the correct tool profile so there is proper clearance.

    If you can use a G32 cycle, it is more adaptable.
    Jim Dawson
    Sandy, Oregon, USA

  4. #4

    Re: Acme 1 1/4" -4 double lead stub acme ext threading.

    Thanks for reply Jim. How far out would I move Z starting point for second G76 pass to make the threads double lead? Still confused. This part has me stumped. I have cut acme threads before but never external acme stubs with double lead.

  5. #5
    Join Date
    Dec 2013
    Posts
    5717

    Re: Acme 1 1/4" -4 double lead stub acme ext threading.

    Quote Originally Posted by howardjones View Post
    Thanks for reply Jim. How far out would I move Z starting point for second G76 pass to make the threads double lead? Still confused. This part has me stumped. I have cut acme threads before but never external acme stubs with double lead.
    I let the CAM program figure that out. But I think it would 1/2 the lead. That should allow the spindle to make 1/2 rotation extra before the tool engages the work, so the start would be 180° from the first start.
    Jim Dawson
    Sandy, Oregon, USA

Similar Threads

  1. stub acme
    By roncnc in forum Uncategorised MetalWorking Machines
    Replies: 1
    Last Post: 04-16-2011, 12:30 AM
  2. Dual Lead Stub Acme Threads
    By 337MPH in forum MetalWork Discussion
    Replies: 2
    Last Post: 02-14-2011, 05:35 AM
  3. Threading Stub Acme M2
    By KDWIENS in forum MetalWork Discussion
    Replies: 0
    Last Post: 09-01-2010, 09:15 PM
  4. Threading double lead acme
    By bmwfund in forum Diemaking / Diecutting
    Replies: 4
    Last Post: 06-04-2009, 11:26 PM
  5. can stub acme be changed to acme
    By osiris999 in forum MetalWork Discussion
    Replies: 4
    Last Post: 01-28-2009, 09:00 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •