Bottom mould is completly assembled now. All bare or sawn edges are taped of with releasetape and the mould is ready for a coat of releasefilm before mounting all the anchors:
I was in doubt how i should seal these ends, but ended using the tape. I did consider painting the ends and then wax them, but almost nomatter what i do, there will always be some sort of impression in the EG, either from the wood structure or from the tape. With the tape i at least know it will release very easy...and most of the casting will be covered anyways:-)
I originally added ribbing on the underside of the mould to help support the mould and to somewhat isolate it from the concrete floor during the curingprocess. However, i'm not sure it helps anything now that i've assembled it :-)
The top mould is fully assembled, but i didn't manage to finish up the top-mould with tape tonight...maybe tomorrow :-) This is how it looks now, currently upside-down:
(Before anyone asks, this is the tape i've used:
https://www.easycomposites.co.uk/flash-release-tape I've used it previously and it's nice to work with, sticks pretty good while still removeable and nothing sticks to the top side of the tape...)