I had a guy come in to level machine that worked for Okuma Dist and I could move every axis on machine before they came and after they came I noticed he was on his phone pacing back and forth. Long story short he comes and says I’m going to have to get Okuma applications out here because the machine is missing some parameters and he couldn’t get them as fast as the dist could. The whole reason I hired them is because they were recommended and the dist is minimum 2 months out. He charged us $2k was here less than 6hrs and now my machine is alarming out with a “axis needs adjusting inductosyn 5 “ and the XA/XB is in overflow. The machine still isn’t level. It’s a Macturn 250w E100L control and I’ve literally messed with it a week and called the Dist with a tech call last Wed and still haven’t gotten a call. Any help would be truely appreciated. I’ve had this machine 7 months and it hasn’t cut anything. The machine was demo to us before we purchased and I wanted it completely maintenanced and gone through before we put it to work is the main reason I wanted the dist to come in and get it leveled and all lubricants fresh. Now I gotta get it back to where it was before someone even comes out to try and level it. Thanks guys