.
.
.
.
VACUUM HOLDING SET INSTALLATION:
.
.
Machine bed already contains all the channels and holes for
vacuum holding so just a manifold needs to be installed:
Attachment 467216
Manifold will be installed in this area under the machine bed:
Attachment 467218
Screw on the manifold to the underside:
Attachment 467220
Attach the standard Schedule 40 elbow to the manifold.
It can be oriented in any direction to match the vacuum pump location:
Attachment 467222
Overall layout of the vacuum holding system:
Vacuum holding set installation is finished.
A single piece of 1/4" MDF sheet on top of the machine bed to be provided by customer.