There's a massive content drought going on right now so I though I'd revitalize the community with something. It's an older project. If I were to build it, it would probably cost $20k+ and an arm and a leg. It was designed to fit a standard sized garage here in germany(3x5m). It's based on Modig's Rigimill. It uses concrete anchors ala Unisorb Fixators. I'm just dumping the whole WIP folder so it's messy. It was meant to have a 2-axis milling head but I never completed that. I found out that separating the 4th and 5th axis from one another is more feasible (more on that later).
_model7.prt is the main .prt assembly file, (step of the main assembly also included)
If loading the parts in Fusion takes too long just remove all servo files(.prt), they are from grabcad and I had someone mention that loading them in takes forever and never ends.
By the way it takes me 10mins to open the .step but only 30s to open the .prt
My favorite part about this is the under rail cooling pipes.
.prt : https://www.mediafire.com/file/f5q2c...0xinf.rar/file (messy but has drawings of cool parts)
.step : https://www.mediafire.com/file/yzqed...embly.stp/file