Hello,

This is my first post on this forum.

Purchased a PACER 2515-K3 CNC, fired it up, to find a stack of errors in the XMC-E Software, managed to sort that out by changing the battery on the PC's motherboard, reset the time and date and reset the machine and PC.

So now we can load a job in, start the job. The spindle goes to the datum fine, and starts the routing route. Problem is the spindle doesn't spin and the vacuum bed doesn't come on.

We've checked and found there isn't power going to the spindle or the vacuum bed. Does anyone know if there is a setting in the XMC-E software which turns on both the spindle router and the vacuum bed power. Or should should these already have power.

Do I need to look further back in the machine, ie in the control panel, or is this software control problem

Any help would be massivley appreciated,