  1. #1
    Join Date
    Apr 2018
    Posts
    69

    UHPC+steel fixed gantry router/alu mill machine build

    Hi All,
    first exuse me for my bad Englsh. There will be a lot of mistakes and poor expression.
    At the beginning, I want to thank to Peter(peteeng) for the help he gave me over the years with calculations, information and valuable advice.

    It's time to implement an old hobby cnc machine project. Mainly for aluminum and wood.
    But I think it might handle mild steel if used carefully with slow feeds.

    It all started from this thread:
    https://www.cnczone.com/forums/mecha...92570-cnc.html

    Working area: 900x600x185mm (35.4" x 23.6" x 7.3"). Z axis travel: 160mm (6.3").
    Spindle can be moved along Z plate.

    Here are the parts purchased years ago:

    steppers and drivers
    ---------------------
    LinuxCNC MESA 7I76E ethernet card

    Xinlichuan Electrical Co
    LCDA2260H Digital hybrid servo driver
    LC86H3114 3 Phase Nema34 closed loop stepper motor 6.8NM,
    encoder 1000PPR(changed with new encoders with index by me), 7mH inductance

    bracket for stepers:
    --------------------
    HM15-86 steel bracket angular contact bearing P5(C5) precision - pairing DF

    Spindle:
    --------
    RTM110-24Z-3.0
    (constant torque, ceramic bearings)
    ER20 380V 6.7A
    200-400Hz 12000-24000rpm
    2.4-3.4Nm 3.0KW(S1) 4.2KW(S6)

    Linear guide
    -------------
    original HIWIN HGR25R rails and HGH25CAZ0H, HGW25CCZ0H Linear blocks
    SFU2005 ballscrew for all axis with separate double nuts for anti backlash

    igus chainflex® TPE cables
    ----------------------------
    CF35.UL.25.04 motor cable
    CF10.10.04 control cable
    CF11.02.03.02 data transmission cable
    CF11.02.04.02 data transmission cable

    igus® Energy Chain®
    -------------------
    Series R58 and R158 "E2 tubes"

    igus chainflex® Clean Air pneumatic hoses
    -----------------------------------------
    CAPE.A.06.0, CAPE.A.08.0, CAPE.A.10.0

    UHPC base and gantry:
    ---------------------
    TEGNO® special cement (NANODUR Compound 5941)
    aggregate - quartz different sizes (I will post the exact recipe later when it is refined)
    FLUP® - PCE-375 liquid superplasticizer
    ECLIPSE® FLOOR shrinkage reducer
    Straight Copper Plated Micro Steel Fibre 0.2x13mm (1.5% of Volume)

    After many revisions, I am publishing the final version (for now).
    I want to start making the formwork for casting uhpc base and portal.
    I received the cement soon and am just waiting for the stee fiber from China
    So I'm asking for advice if you don't like something or it's wrong.

    I would like the base to be thicker and without a beam structure, but the requirement is that it can be lifted and moved without special equipment.
    That's why it's this complicated shape - to optimize the weight. Base: 135 kg. Gantry - 102 kg.
    For this reason, the base is reinforced from above with 50x50mm dense calibrated steel C45 beams .
    Bottom - 60x80x5mm rectangular profiles.

    On the back of the portal I will install a 10mm steel plate.
    Perhaps it is not needed, but I have such excess material and it will additionally strengthen the portal.

    There is no steel in the castings (except for a few thread insert at the base of the gantry). All connections are bolted through the concrete.
    Any small irregularities in the common surfaces between concrete and steel (slabs, profiles, etc.) will be leveled with
    liquid metal Loctite EA 3478 A+B (Compressive Strength 134 N/mm2, @65ºC, ISO 604).

    The stand will made of IPE 200 profiles. I gave up on welded structures because of continuous deformations over time.

    IPE profiles make for the easiest bolt connections (again with Loctite EA 3478 between them)

    First I have to prepare the forms for casting the concrete.
    I will post pictures of the progress of the project.

    Happy Holidays !
    I wish everyone good health!
    And good luck too!
    Attached Thumbnails Attached Thumbnails base.jpg   gantry.jpg   moving-table.jpg   router.jpg  

    spindle1.jpg   spindle2.jpg   stand.jpg   x-axis1.jpg  


  2. #2
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    continue....

  3. #3
    Join Date
    Jul 2018
    Posts
    6341

    Re: UHPC+steel fixed gantry router/alu mill machine build

    HNY for 2024 Ivan - Great to see your design. Look fwd to seeing it materiaise into reality. Add generous radii to the inside corners of the base to prevent cracking and wax those moulds well!! I see you have speced Z0 preload cars. This is not recommended for this type of machine. Best is ZB but ZA is better then Z0 if you can't get ZA.... Peter

    edit - Ivan your English is perfect!

  4. #4
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Happy New Year !
    Yes Peter, I wanted to buy blocks with ZA preload, but in Bulgaria, the HIWIN distributor offered a only Z0. They are mass bought . They told me that for a router preload Z0 is enough. They also told that the ZB move quite hard and wear out quickly. My blocks are already bought anyway and I can't return them.
    The only way is - I to buy quality steel balls with the required diameter for ZA or ZB and replace them.
    I will look for information on ball sizes for the different preload.
    Maybe it will be difficult to assemble bloks with balls for ZB preload !.
    So, ZA or ZB?

  5. #5
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Quote Originally Posted by peteeng View Post
    ....Add generous radii to the inside corners of the base to prevent cracking and wax those moulds well!!....
    Ok. I will do that. Thank you !

  6. #6
    Join Date
    Mar 2020
    Posts
    179

    Re: UHPC+steel fixed gantry router/alu mill machine build

    I also tried to buy HGH-20-HA blocks with ZB preload and was told by the distributor (an aliexpress store in this case) that Hiwin does not recommend ZB preload for smaller size rails. So I got ZA preload. Hopefully and probably they will be fine, I will find out soon.

  7. #7
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Thank you so much catahoula for this info. Ok, I will want steel balls for ZA preload.

    P.S. I'm impressed with the very stiffness machine you've made.

  8. #8
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    So far I can't find any information about the diameter of the balls for HIWIN HGH25.
    I found only about some Chinese brand SNWNYN in which they write about their HGH25 - ball diameter 4.763mm.
    I have a precision micrometer and I will measure balls of my blocks. But they for preload Z0 !
    And what should they be for ZA preload?

  9. #9
    Join Date
    Jul 2018
    Posts
    6341

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Hi Ivan - The med preload cars easily slip onto the rails by hand. Send a note to Hiwin direct with your questions they will answer. Peter

  10. #10
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Quote Originally Posted by peteeng View Post
    Hi Ivan - The med preload cars easily slip onto the rails by hand. Send a note to Hiwin direct with your questions they will answer. Peter
    OK Peter.

    HGH25CAZ0H ball diameter - 4.748mm at temperature about 22 degree celsius.
    Only one ball was measured - several times. The value does not change.

  11. #11
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    These are the casting molds. There is a lot of work on them. Lots of steel tubes (10x1mm) for the through bolts. They will remain in the cast concrete. Today I start making the molds.
    Attached Thumbnails Attached Thumbnails mold-form-X.jpg   mold-form-Y1.jpg   mold-form-Y2.jpg   mold-form-Y3.jpg  


  12. #12
    Join Date
    Jul 2018
    Posts
    6341

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Hi Ivan - Ambitious - I like it. Peter

  13. #13
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Thanks Peter !
    Here are the molds for internal castings (X base).
    From three pieces glued together to achieve the required thickness (95mm and 75mm).
    XPS Fibran and chipboard. This was necessary because I have nothing to cut more than 4.5 cm thick with.
    Then I will fill the chipboard cuts with wood putty, round the edges with sandpaper and paint them.
    Attached Thumbnails Attached Thumbnails xps.jpg   xps-fillet.jpg   inner-cast.jpg  

  14. #14
    Join Date
    Jul 2018
    Posts
    6341

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Hi Ivan - Typically for fillets we use automotive body filler. Wood filler may go soft or dissolve. Better do a test or read the tech sheet on your proposed filler. Peter

  15. #15
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Peter, I took your advice and bought polyester body filler

  16. #16
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    The mold for X is almost ready.
    Attached Thumbnails Attached Thumbnails x-mold1.jpg   x-mold2.jpg  

  17. #17
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    The bases for the x and y rails arrived today. Processed on a flat grinder (I don't know if this is the correct name in English)
    Since the working length of the grinder is up to 1000 mm, but X is 1500, first 1000 mm were processed, then by sliding the workpiece - the remaining 500 mm. Since there is no way to get an exact fit this 500mm are left about a few microns higher.
    I'll hand-finish them with a new russian bridge straight line, painting and hand scraping.

  18. #18
    Join Date
    Mar 2020
    Posts
    179

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Looks like you're off to a great start. I hope you can get the base out of the mold without any damage!

  19. #19
    Join Date
    Apr 2018
    Posts
    69

    Re: UHPC+steel fixed gantry router/alu mill machine build

    Catahoula, I will try to be very careful . I will use PLOPP mould release agent.
    But there will probably be some minor chipping along the edges that will be fixed later. Today I'm going to do some rounding on all the edges with acrylic silicone.

  20. #20
    Join Date
    Mar 2020
    Posts
    179
    Maybe you could attach the steel bar that goes onto the open side before de-molding, to reinforce it?

Page 1 of 3 123

Similar Threads

  1. UHPC fixed gantry mill build
    By Momentz in forum CNC "do-it-yourself"
    Replies: 40
    Last Post: 03-03-2024, 02:38 AM
  2. steel/aluminium fixed gantry build
    By v2tiller in forum DIY CNC Router Table Machines
    Replies: 38
    Last Post: 06-16-2020, 09:42 AM
  3. A Fixed Gantry Cast Iron/Steel Build
    By yezard in forum Uncategorised MetalWorking Machines
    Replies: 9
    Last Post: 04-03-2018, 10:00 PM
  4. Replies: 17
    Last Post: 10-26-2015, 11:43 PM
  5. 2nd Build - Steel Tube, Moving Gantry Style, Mill / Router
    By InventIt in forum Vertical Mill, Lathe Project Log
    Replies: 73
    Last Post: 02-26-2012, 08:15 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •