I have a Puma 2000sy and am looking to add a sprung loaded centre to machine longer components.Attached is a dwg of the centre which I have been sent.The idea is that the centre sits in the U-Drill holder until required and then is picked up by the sub-spindle and used to support the work then put back in the tool holder so that the parting operation can be done using the sub-spindle to hold the component.
My problem is that there is very little information on the dwg to enable me to make this.
Has anyone ever made one of these ?.If so,the 2 main pieces of info I need are :
What is the clearance between the barrel and plunger and what kind of springforce would I need (which spring do I use),There is also an issue with the sub-spindle tripping out on a torque skip,but I think this is just an M-function (M86 ??? we'll worry about that later)
Thanks
Martin