    Spoilboard - brand, availability

    I live in Ontario, 2 hours north of Toronto.
    Apparently Trupan Ultarlight is the ultimate spoilboard - I can't find it anywhere nearby.
    Does anyone have recommendations for a lightweight more porous spoilboard solution that I could get a couple sheets of? I have a 4' x 8' table.
    Thanx,
    Grant Nicholson

  2. #2
    Join Date
    Feb 2005
    Posts
    921
    Have you thought about using a 4x8 sheet of LDF. Thats what they use to hold sheets of plywood where I work. They just skim down both sides before the first use.
    Robbie

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

  3. #3
    Join Date
    Apr 2008
    Posts
    80

    Spoilboard

    LDF - that's a norbord product name isn't it?

    Are you using the 3/4" or the 1/2"?

    When you mention skimming down the sides, is it because it's coated or faced with something?

    I have an Amana surfacing bit coming to shave down the board as I use it (and to get ideal depth).

    Thanx,
    Grant

  4. #4
    Join Date
    Feb 2005
    Posts
    921
    The LDF stands for "light density fiberboard". They use 3/4", The reason they skim it the first time is to remove the thin coating on the top and bottom surface, Which really increases the vacuum going through it. Then as they use it they will occasionally skim it to remove the cut lines of all the different parts they cut on it. When they do that; they will usually skim the side they have been cutting on then after they skim it they will flip it over because it will usually bow up on the side that was skimmed. (The bowing maybe caused by all the humidity here, were in the south east, united states, although im not sure if thats the reason or not). They will keep repeating the process of running parts and skimming the spoilboard untill the spoilboard gets to about 5/16 or 1/4 inch thick, then they will throw that one away and start the whole process over with a new one. They can usually cut on the same one for a week or maybe a little longer before it ever needs to be skimmed down. I hope this helps- Robbie
    Robbie

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

  5. #5
    Join Date
    Feb 2005
    Posts
    921
    I forgot to mention, before they bought another vacuum pump they had two of the CNC machines hooked up to the same vacuum pump. They used to put duck tape on all the edges of the LDF to help prevent vacuum from leaking out the edges. Since they bought more vacuum pumps they have more then enough vacuum and don't need to tape the edges any more.
    Robbie

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

  6. #6
    Join Date
    Apr 2008
    Posts
    80

    Spoilboard

    Thanks - that's exactly what I wanted to know - I have fairly high humidity, plus only 1 10hp vacuum pump - the duct tape will help I bet.

    I've only had my machine (it's full time) for two months, and I'm really eager to get the surfacing bit in another week or so. I've been using medium density mdf, and no doubt there's a 'skin' on the surface. It doesn't take many jobs to scar up the surface and reduce the hold down capacity!

    cheers,
    G

Similar Threads

  1. ridges on spoilboard when surfacing
    By Dan.antes in forum Calibration / Measurement
    Replies: 8
    Last Post: 12-15-2009, 08:23 PM
  2. Availability pams.cmd or ptams.cmd
    By LTWamp in forum EdgeCam
    Replies: 1
    Last Post: 01-16-2008, 06:53 AM
  3. Rutex THC product availability
    By rutexus in forum Rutex Products
    Replies: 0
    Last Post: 11-28-2007, 04:10 PM
  4. spoilboard material
    By lonesome dave in forum Material Machining Solutions
    Replies: 0
    Last Post: 07-24-2007, 02:55 PM
  5. Brass availability
    By Ken_Shea in forum MetalWork Discussion
    Replies: 4
    Last Post: 12-27-2004, 02:49 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •