586,060 active members*
4,192 visitors online*
Register for free
Login
Results 1 to 4 of 4
  1. #1
    Join Date
    Feb 2010
    Posts
    0

    switching from Win PCNC to Mach 3

    Hi, im new to this forum and have just installed mach 3 on my computer for my cnc step high z s720. previously i was using Win PCNC but decided to change to Mach 3 as i really liked the 3D display and the easy of control and use. i had some problems setting it up but eventually got it moving.

    im still left with some problems though...
    i decided to run some codes that i had previously used with PCNC using the same vice and exact location that i would have used before, but i noticed my starting origin was different to my previous origin (i had a hole drilled in the exact co-ordinates of 200,210) and when i moved the tool to that location with Mach 3, the tool was off, it seems near enough in the x axis but my y axis seems off by nearly a mm id say, i no this doesnt seem a lot in the grand scale of things, but the work i do is very precise and needs to be spot on every time.

    what seems to be the problem and is there any way to fix it? please say i dont have to go back to using PCNC for this work?

    Marian

  2. #2
    Join Date
    Mar 2003
    Posts
    35538
    Maybe adjust your steps/unit slightly?
    Gerry

    UCCNC 2017 Screenset
    http://www.thecncwoodworker.com/2017.html

    Mach3 2010 Screenset
    http://www.thecncwoodworker.com/2010.html

    JointCAM - CNC Dovetails & Box Joints
    http://www.g-forcecnc.com/jointcam.html

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

  3. #3
    Join Date
    Mar 2003
    Posts
    104
    Go to "motor Tuning" and check your distance per step setting.

    Jim
    www.outbackmachineshop.com

  4. #4
    Join Date
    May 2007
    Posts
    781
    Quote Originally Posted by marianhall View Post
    but i noticed my starting origin was different to my previous origin (i had a hole drilled in the exact co-ordinates of 200,210)
    I am guessing you program you parts relative to the machine coordinate system home switches.
    Do you know about work offsets, G54,G55, etc.?

    On most controls G54 is active by default so all you may need to do is change the G54 offset values by however much you are off.

    I am assuming you have the steps per unit set so that 100mm of commanded motion moves the tool 100mm on the machine.

Similar Threads

  1. switching x and y
    By ataxy in forum Mastercam
    Replies: 4
    Last Post: 09-24-2009, 12:01 AM
  2. Solidworks > ??? > Mach 3 > Tormach PCNC 1100
    By kgiessler in forum Uncategorised CAM Discussion
    Replies: 19
    Last Post: 11-04-2008, 12:03 AM
  3. Mach 3 Released for PCNC-1100
    By MichaelHenry in forum Tormach Personal CNC Mill
    Replies: 13
    Last Post: 06-12-2007, 05:28 AM
  4. Pwm switching
    By miro in forum Gecko Drives
    Replies: 0
    Last Post: 01-23-2007, 10:22 PM
  5. Switching to carbide?
    By warpedmephisto in forum Benchtop Machines
    Replies: 11
    Last Post: 06-23-2006, 10:46 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •