Hi,
I've been lurking for a couple of years around the 8020 router build forums.
I've also read everything widgitmaster has done - several times.
I stumbled into some I Beams at $0.15 a pound. That got me thinking.
I came up with the design below. No mold required at all. I realize this
is not the optimum use of E/G, but for me it is quick and painless to do.
I have access to a large Hass to machine the Ibeam surfaces true after
they are welded.
I'm thinking of filling the left side space between the flanges in pour #1. The right side flanges in pour #2. and the void between the two I beams welded together in parallel in pour #3.
I'll be traveling for a few weeks - starting tomorrow so I won't be able to reply any time soon, but a friend or two of mine here can at least see my design and
well, probably tell me not to do it this way...