    Hi and sorry for my english

    I use a Multus U3000 and i have a question

    I have to move one part from the first spindle to the second spindle

    Of course, work all, synchronization are ok if i use M210 M151 M883

    But i have to make one part in the spindle A from the bar and on the second spindle i have a support with screw, so i have to move the second spindle to the piece

    And put a screw

    I want use in the spindle A and spindle B an M110 code... for perfect synchronization, put the screw, restart

    But if i have M110 code in G140, i can't put M110 code in G141 (i can only if i change prossimity position)

    Any idea for have all two spindle in M110?

    That is the problem!

    Thank you so much to all

  2. #2
    Member
    Join Date
    Jun 2015
    Posts
    3525

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    hy andy try this program :
    G140
    M110
    G00 C30
    VCPPH=90
    M892

    maybe it works if not, pls share an image with your setup, maybe something can be done without c axis / kindly
    Ladyhawke - My Delirium, https://www.youtube.com/watch?v=X_bFO1SNRZg

  3. #3
    Registered
    Join Date
    Apr 2009
    Posts
    1168

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    M110 synchronization on both spindles requires special software specification from Okuma and is an option. M151 is as accurate as M110. The same encoders are used. You should be able to perform the M151 then go to a M0 install your screw and then cycle start all while the M151 is active. M151 is perfect synchronization and can be adjusted by parameter for alignment position. It can start, stop, reverse, use M1 or M0, go into mid-auto-manual, jog spindles manually, and go back to auto and cycle start all without losing the M151. Nobody in the industry does it as well.

    Will this work for what you are trying to accomplish?

    Best regards,
    Experience is what you get just after you needed it.

  4. #4
    Member
    Join Date
    Jun 2015
    Posts
    3525

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    hello M697 allows transfer accuracy equivalent to c axis, otherwise accuracy decreases with rpm, yet it is still ok for most operations on normal lathes

    gang lathes, being able to rev higher, have more phase error; citizen has an interlock for that / kindly
    Ladyhawke - My Delirium, https://www.youtube.com/watch?v=X_bFO1SNRZg

  5. #5
    Member
    Join Date
    Jun 2015
    Posts
    3525

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    Nobody in the industry does it as well
    hy mr wizard if you wish, pls check attached : manual says 0.1degres at 1000rpm ( and maybe proportionally for each 1000rpm more ), and that's <0.09 on the circumference of a part of 100 diameter

    it should be enough for most transfer applications, it's a lathe after all
    Ladyhawke - My Delirium, https://www.youtube.com/watch?v=X_bFO1SNRZg

  6. #6
    Registered
    Join Date
    Nov 2015
    Posts
    12

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    M151 of course work amazing, but M151 want A spindle close and B spindle OPEN

    So i have to move the prossimity for work with M151 in this situation...

    M696 don't work

  7. #7
    Registered
    Join Date
    Apr 2009
    Posts
    1168

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    Ah… but there is a special system parameter VCHIO which can be used to change from OD to ID chucking thus faking out chuck open interlock.

    Should do the trick for you.

    Best regards,

    VCHIO=0
    M151
    VCHIO=1
    Experience is what you get just after you needed it.

  8. #8
    Registered
    Join Date
    Nov 2015
    Posts
    12

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    i try but don't work!

    I need to change in parameters anything?

    My machine don't accept VCHIO

  9. #9
    Registered
    Join Date
    Nov 2015
    Posts
    12

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    on OSP-U100 work, on OSP-P300 don't work

  10. #10
    Member
    Join Date
    Jun 2015
    Posts
    3525

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    hy on p300, use M883 M151 M210 instead of vchio; pls share more infos, if you need to keep spindle phasing, so to see a work arround

    M696/697 is spec, not default / kindly
    Ladyhawke - My Delirium, https://www.youtube.com/watch?v=X_bFO1SNRZg

  11. #11
    Registered
    Join Date
    Nov 2015
    Posts
    12

    Re: Okuma twin spindle - Synchronization - G140 G141 M110

    nothing, if all two chuck are closed don't work. Only if B chuck is open that work.

    Need to try some different... or i try to send photo for better explication, bad english here

Similar Threads

  1. Replies: 1
    Last Post: 04-08-2016, 02:55 AM
  2. Replies: 3
    Last Post: 01-24-2015, 12:41 PM
  3. Replies: 0
    Last Post: 10-17-2014, 06:38 PM
  4. Replies: 4
    Last Post: 10-02-2014, 04:58 AM
  5. G141 Sub spindle Z axis questions (parameters)
    By Clonekid54 in forum Okuma
    Replies: 4
    Last Post: 02-06-2014, 04:59 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •