Hi all,
I have a question about the estimated cycle times presented in the backplot details/info. I have been having a conversation that has been ongoing with a coworker of mine about the accuracy of the backplot cycle times info. He has told me that there are big differences in what are estimated in MC vs what are actually at the machine. so today I paid closer attention to this and found out that there can be as much as 25% or more difference in what MC says vs what the actual machine cycle time states. MC says the cycle should be shorter.
I ran a program that MC said was 30 or so minutes and the actual machine time was more like 46 minutes.
Is there a setting that can be tweeked in MC that can more accurately reflect what we are actually expiriencing at the machine?
Chris