587,751 active members*
3,020 visitors online*
Register for free
Login
IndustryArena Forum > MetalWorking Machines > Milltronics > Aaaargh! Using work coordinate systems with Centurion 6
Results 1 to 20 of 21

Hybrid View

  1. #1
    Join Date
    Apr 2007
    Posts
    3

    posisitioning

    hi there, I think you might need a feed rate with a G1, a G00 dosent use feed rate but uses the machines rapids

  2. #2
    Join Date
    Mar 2003
    Posts
    214
    I use a Centurion 6 control. I always set my tools with a setting light that you can buy anywhere for under $100. I set the setter on the back stationary jaw block on my kurt vise. I set all my tools off of that setter. Then I measure from the top of the setter to the top of my part and go to F7 Parameters, F2 Coordinate, scroll down to G54 and press the edit key. Scroll down to the Z coordinate and enter that measurement in the Z offset and make sure to press enter. Watch your signs, + or -. Then I call the offset after the tool change and tool height command

    T1M6
    S3000 M3
    G43 H1
    M8
    G54
    G0 X0 Y0 Z.1

    Works every time for me.
    Ken

  3. #3
    Join Date
    Nov 2004
    Posts
    11
    Finally the voice of experience gets it right!

  4. #4
    Join Date
    Apr 2007
    Posts
    14
    You must make sure that in the g54 coordinate edit screen Z is zero before you set all your tool offsets. Set all your tool offsets (H's) first then change the G54 Z coordinate. If you run a program then decide to add another tool, change your G54 Z back to zero then the set the new tool offset (H), then change your G54 Z. I always use a 2" tool offset guage so my G54 Z is always zero when setting tools and -2.0 when cutting.

Similar Threads

  1. Hass VF-1 work coordinate problems
    By 1strokedrs in forum Haas Mills
    Replies: 58
    Last Post: 05-11-2012, 05:43 AM
  2. Centurion 5 vs. Centurion 6 and validation codes
    By Turbo VW in forum Milltronics
    Replies: 2
    Last Post: 02-11-2007, 09:35 PM
  3. Replies: 7
    Last Post: 07-09-2006, 06:51 PM
  4. Macro Work Coordinate
    By firedog in forum G-Code Programing
    Replies: 7
    Last Post: 06-17-2005, 06:03 PM
  5. Work coordinate in canned cycle line
    By acseatsri in forum G-Code Programing
    Replies: 1
    Last Post: 02-15-2005, 04:11 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •