Hi, so I have this working now. tool change is T101 for tool 1 , T102 to T110. tools 2 to 10. on first spindle.

the tool offset is G43 H11 to H20 for tools 1 to 10.

Now I just need to fix fusion post so it gives me those numbers...

And Z0. is right at the spot where the tool touch off sits. So if touch off sits on top of work piece, that is where Z0 will be. No need to g92 Z0 at zero height.