I am having trouble with Mach 2 moving the correct amount of steps. It thinks it has moved say 7 inches and it only really moved an inch (just an example, I'm not in front of the machine right now so I don't know what the actual is)
Anyhow, I have 1/2-10 acme rod, and the xylotex control with xylotex 200 steps per rotation motors. So.....I figure 2000 steps per inch. But Mach 2 doesn't seem to agree. Could the xylotex pcb be set for microstepping or something?????