How much overhead clearance (Clearance for running the mill) do I need on a VF2 with the spindle sitting on the shipping block?
I have a vaulted ceiling, so when the machine arrives with the spindle bolted to the table I need to know how much over head space I need from "that point". I need to make sure it is set with enough head room before the jacks are removed.
It's a used machine, so I don’t want to rely on the riggers knowledge of the VF2 when placing the mill. I don't want to be stuck having to move the machine because of head clearance after they leave. With the hourly rate they charge I want them back on the road ASAP.