i'm all set up to cut threads, but on the "indicator table" (see image below) it doesn't mention metric. i assume this means i use "the others" (1,4,7,11), but if i pick 1, do i have to always use 1 or does 4, 7, and 11 work for the same piece of work?
thanks guys