I made a lot of progress this week.
1. 4 legs are with the welder to add the bottom plates.
2. All but the 2 y-axis support AL pieces are cut to size.
Andrew
I made a lot of progress this week.
1. 4 legs are with the welder to add the bottom plates.
2. All but the 2 y-axis support AL pieces are cut to size.
Andrew