How can commonly mass-produced transmission components, such as planetary gears be produced even more efficiently? The EMAG Group provides a customized answer to this question with the development of the twin-spindle pick-up turning center, VL 1 TWIN. It machines two identical components simultaneously in the same machining area. This technology opens up a wide range of possibilities: When two machines are combined in a line, the planetary gear can be machined from two sides—and all that is completed with shorter cycle times. What exactly does the line solution for planetary gears look like?

Planetary Gear: Two Finished Parts Every 20 Seconds

What exactly does a VL 1 TWIN line solution for the soft machining of planetary gears look like? The process is generally run on two machines that are connected to each other via a TrackMotion automation system. The associated TransLift (a lifting and rotating carriage with an electric gripper) simultaneously picks up two raw parts from the feeding conveyor and 

transports them to the first machine. The VL 1 TWIN’s two pick-up spindles then take over and place the components into the machining area. The turning operation then follows on the first side of the inside and outside diameters (OP 10 – OP 10). The diameter and length (X/Z directions) of both workpieces can be readjusted independently of each other, since the headstocks can traverse autonomously. This is particularly important after a tool change to compensate for deviations (e.g. after replacing the indexable inserts). Once the two semi-finished components have been transported out of the machine compartment, the TransLift takes over again to turn them by 180 degrees and transport them to the second VL 1 TWIN. This is where the second side of the outside diameter is turned on its face (OP 20 – OP 20). The TrackMotion automation system then finally places the finished component on the conveyor belt, which can hold up to 400 finished parts on the integrated stacker units. The overall process is completed within a cycle time of about 20 seconds for two components. The average chip-to-chip time is just under 5 seconds. This tremendous pace is made possible by a series of technical configuration details: The two pick-up spindles feature high power values of 9.9 kW (13 hp) and 136 Nm (100 ft-lbs) at 40% duty cycle. At the same time, the wear-free linear drive in the X-axis (in combination with the direct distance measuring systems) has a high acceleration of 8 m/s2 (26 ft/s2) -including long-term accuracy. This allows for controlled manufacturing of the frequently required H6 fits of the main drill hole.

 

Perfect Solution for Transmission Production 

Overall, the TWIN approach allows for enormous increases in productivity for a whole series of components—from cam elements to bearing rings all the way to flanges. Depending on the requirements, we can also create multi-technology production lines that include EMAG hobbing and deburring machines, for instance.

 

Find out more about the VL 1 Twin or visit Emag at EMO Hannover 2019 in Hall 17, Stand C29 and see first-hand the benefits of the VL 1 TWIN’s performance.

Login or register now and enjoy all the benefits of a community!

To get the whole functionality of IndustryArena Forum you need to login or register. This process is absolutely free.

Password forgotten?
Contact request
Guest Photo
Your message
The controller within the meaning of Art. 4(7) GDPR is: IndustryArena GmbH, Katzbergstraße 3, 40764 Langenfeld, Germany.
You may reach our data protection officer under [email protected].

Purpose of processing
We process your personal data concerning the use of the contact form and the communication with the company of the newsroom as well as the transmission of your data to this company in accordance to Art. 6 (1a) GDPR. This constitutes a legitimate interest for us in accordance to Art. 6 (1f) GDPR.

Recipient of the data
Within our organization, those units gain access to your data, which are necessary to fulfil the above purposes.
Personal data will only be transmitted to third parties if this is necessary for the aforementioned purposes or if another legal basis exists. If necessary, we conclude the corresponding data protection agreements with third parties, in particular pursuant to Art. 28 GDPR.

Data storing
Your data will be transmitted to the company of the newsroom for further processing. The period of storing is the duration of the processing of your request by the respective company.

Design options

  • Title text color:
  • Content background:
  • Content text color:
  • Navigation background:
  • Tab text color:
  • Active tab text color:
  • Link text color:
  • Active link text color:
  • Background image Background color:

    How do you want to position the background-image?

    Set the link for the background image

  • Banner

    How do you like to align the banner?

    Set the link for the banner

  • Skyscraper

    Set the link for the skyscraper